Skip to content
77 Legacy Group
Studio D1 Arquitetura

02 · Design03 · Works & renovation

A design that belongs to the landscape it sits in.


Contemporary, signature architecture conceived for its site. From first concept to final specification. And, when the client wishes, the same house oversees the works — execution stays with the appointed contractor, technical responsibility with whoever drew it.

The two lines

Whoever draws it follows the works.

The two lines can be engaged together or separately.

  • 02

    Design

    Contemporary, signature architecture conceived for its site; from first concept to final specification.

    See the design scope →
  • 03

    Works & renovation

    Site supervision and technical responsibility for high-end works and renovation. The building contractor is engaged separately.

    See the works scope →

The method

From concept to keys.

The process is the same from the first study: understand the site and how the house will be lived in, fix the concept, and only then detail it. No stage moves forward without written approval of the one before.

  1. 01

    Site visit and reading

  2. 02

    Brief and concept

  3. 03

    Schematic design

  4. 04

    Construction documents and specifications

  5. 05

    Coordination and cost plan

  6. 06

    Construction and handover

Design scope

What the design covers.

The drawing does not end at the floor plan. The delivery covers materials, lighting and everything the works need in order not to improvise on site.

  • Preliminary study
  • Schematic design
  • Statutory drawings and planning approval
  • Construction documents
  • Joinery detailing
  • Finishes specification
  • Lighting design
  • Coordination with the consultant packages

Construction and renovation

We are not the builder. We are who answers for the works.

The works are carried out by a contractor engaged separately — and it is Studio D1 that answers for them technically. We inspect the site, measure progress, sign off stage by stage and manage suppliers, so the owner never has to coordinate contractor, joiner and landscaper alone. Renovating an occupied house is handled with an agreed schedule and agreed access, never improvised.

  • Schedule and cost plan
  • Supplier management
  • Periodic measurement and reporting
  • Handover against a signed checklist

Why inside the group

The design begins before the land is bought.

Sitting inside 77 Legacy Group changes the order of things: feasibility is read while the property is still being appraised, not after the deed is signed.

Brokerage, architecture, site supervision and management each have their own specialist team — and the four arms operate under the same direction. Nothing is lost between suppliers who never speak to one another.

Canaã Imóveis de LuxoCanaã Yachts

The group's cycle

  1. 01Find
  2. 02Design
  3. 03Oversee
  4. 04Navigate
  5. 05Manage

Projects

Projects.

Studio D1's projects are documented together with their owners and released only with their consent. The portfolio is presented on request.

  • Clube Reserva das Aroeiras lit at dusk, with lawn and glazed façade

    Clube Reserva das Aroeiras

    • Gourmet space
    • Sauna
    • Tennis court
    • Pool
    • Gym
    • Helipad
  • Casa Savili in a horizontal line, with lit timber ceiling and a view over the bay

    Casa Savili

    • 8 suites
    • Gourmet space
    • Sauna
    • Helipad
    • Pool
    • Private pier
  • Casa Fila veranda with a green roof slab, stone wall and surrounding woodland

    Casa Fila

    • 8 suites
    • Gourmet space
    • Sauna
    • Helipad
    • Pool
    • Private pier
  • Casa Estúdio at night, with timber deck, lit pool and a living room open to the outside

    Casa Estúdio

    • 4 suites
    • Gourmet space
    • Sauna
    • Helipad
    • Pool
    • Private pier
  • Casa Praia with edge pool, loungers and a green wall, open to the hills

    Casa Praia

    • 6 suites
    • Gourmet space
    • Sauna
    • Helipad
    • Pool
    • Private pier
  • Casa Grazi amid dense planting, with white volumes and glazing facing the valley

    Casa Grazi

    • 6 suites
    • Gourmet space
    • Sauna
    • Helipad
    • Pool
    • Private pier
  • Casa Savioli over three floors, with glass balconies and palms in front

    Casa Savioli

    • 8 suites
    • Gourmet space
    • Sauna
    • Helipad
    • Pool
    • Private pier
  • Glazed climate-controlled wine room, with a round table and timber armchairs
  • Suspended timber stair with slatted panelling and a living room open to the garden
  • Open kitchen with a stone island, woven pendant lights and a timber ceiling

Technical lead

Every project has a name answering for it.

Ricardo Meira

Architect in charge

Studio D1 is led by architect Ricardo Meira, technically responsible for both design and construction. The concept carries his signature, and so does accountability for what leaves the site — from first study to handover.

How it begins

Tell us about the site or the house.

A first conversation is enough to know whether the project makes sense, and in what order. No information about the property is released without the owner's consent.

Studio D1 Arquitetura

One standard, from first concept to final specification.

The same care we give a beachfront mansion, we give to the last filter change.